Our supporters

Business

Anbrico Felixjaz DVDs

Bridlington Hotel and Guesthouse Association

Bridlington Station Buffet

East Yorkshire Motor Services

Hull and Humber Chamber of Commerce

Palm Group printers

PD Ports of Hull

The Railway Public House, Cottingham

Rail

Campaign for Better Transport

Community Rail Humber

Poppleton Railway Nursery

Railfuture

RCTS - Hull branch

Trimley Station Coummunity Trust

Local Authorities

Beverley Town Council

Bridlington Town Council

Cottingham Parish Council

Kingston upon Hull City Council

Market Weighton Town Council

Pocklington Town Council

Withernsea Parish Council

Sigglesthorne  Parish Council

Rudston Parish Council

Kirkburn Parish Council

Foston-on-the-Wolds Parish Council

Carnaby Parish Council

Skipsea Parish Council

Molescroft  Parish Council

North Frodingham Parish Council

Willerby Parish Council

Brandsburton Parish Council

Southcave  Parish Council

Faith

Rev Jeremy Fisher (former Vicar of Beverley Minster)

Rt Rev Richard Frith (Bishop of Hull)

Rt Rev Terence Drainey (RC Bishop of Middlesbrough)

MPs

Rachael Maskell MP (City of York)

Alan Johnson MP (Hull West and Hessle)

Diane Johnson MP (Hull North)

Sir Greg Knight MP (East Yorkshire)

Ann Mcintosh MP (Malton and Thirsk)

Graham Stuart MP (Beverley and Holderness)

Julian Sturdy MP (York Outer)

Karl Turner MP (Hull East)

MEPs

Timothy Kirkhope (MEP Yorkshire and Humber)

Linda McAvan (MEP Yorkshire and Humber)

Peers

Lord Adonis

Lord Haskins

Lord Mandelson

Lord Prescott 

Media

Adam Hart-Davis

Other Campaigns

CPRE (East Riding)

 

 

 

 

Events (see Events tab for full details)

Facts and FAQS

What are the likely journey times between the railway stations on the line?

FROM YORK TO

EXPECTED JOURNEY TIME

Haxby

   5 minutes

Stamford Bridge

 14 minutes

Pocklington

 24 minutes

Market Weighton

 33 minutes

Beverley

 48½ minutes

Cottingham

 54 minutes

Hull

 65 minutes

How frequent will the train service be?

We would envisage the train service being every half hour, calling at all stations between York and Hull. That said, there may, if there is sufficient demand, be fast direct services between the two cities. The MRC is also considering a spur to Bridlington, which would enable a direct service to operate to York. If possible we hope to see trains continuing beyond York to Leeds, and possibly Manchester.

Who will operate the trains?

The franchise holder- the sucessors to Northern or TransPennine at the time the line opens.

My house is on the alignment of the old railway line - I am worried, will my house may be demolished!

Our proposed alignment will see no properties demolished. Unfortunately much of the former route has since been developed, so we are planning to use the old railway alignment in the countryside between the towns or villages, and divert around existing built-up areas. More information about the proposed site of each new station can be found on the page for each location - although these plans might change as the campaign progresses. In early 2014 East Riding of Yorkshire Council  voted to allow housing developement over the sites at Pocklngton and Stamfrod Bridge which the MRC are objecting to. If the ERYC Local Plan is upheld then a new route will need to be identified in these areas. By January 2015 development has started on the site at Pocklington even though the local plan has yet to be agreed. 

As a car driver why should I support this Campaign? Rail campaigns are usually anti-road!

One important thing to note is that we support the A1079 Group, which is campaigning for a limited number of improvements on that road (see links page). The Minsters Rail Campaign is about giving choice to the people of the Wolds, and the provision of the railway will remove much road traffic, reducing congestion and  the likelihood of accidents. We believe integration is the way forward, rather than competing against other modes, and we know that many rail passengers will use cars to get to the railway stations.

What will happen to the existing bus services?

One of our supporters is East Yorkshire Motor Services, who see the railway as a benefit to the local area, and something that can be integrated into improved local transport. As well as trying to get the railway built, the MRC wants to see a Swiss transport model in place, with connecting buses to local villages which will not directly served by the railway.  To achieve this goal, the Campaign will work with local bus companies although in 2015 continuing pressureonlocal subsidies sees fewer and fewer local businesses. 

Will the railway carry significant amounts of freight?

No - the line will be available for freight trains to use, but most freight traffic will come out of Hull via the existing route beside the Humber. The current track layout at York station, and the number of trains forecast to use it, means that freight traffic would be limited on the Minsters Line. It should also be noted that the route is more steeply graded than the alternative routes via Goole or Selby, and this would restrict train loads and speeds. It is unlikely (but not impossible) that the line will generate any new freight flows.

Why not build a tramway?

There are advantages and disadvantages about building a tramway. At MRC we believe that being part of the national rail network is an important benefit for the railway. However if the railway was built as a tramway, it would be able to access the centres of the towns and villages. What’s your view? Let us know on the guestbook page.

Will the line be electrified?

We would like the line to be electrified from the outset, but it is possible it will initially be diesel operated. Any structures such as overbridges will be built with electrification in mind.

Will there be any level crossings on the line?

If the line is built as part of the national railway network, then road and rail traffic will be completely separated, in order to reduce the risk of accidents. If the line is built as a tramway or light rail, then roads and trams will interact within towns and villages, with appropriate safety measures.

So how much will the line cost?

Our current estimate is in the region of £320m for the line. We have not costed a tramway, which might cost less to build per mile, but would require specific rolling stock and maintenance facilities. At this stage we need to build the business case, and get Network Rail to recognise the scheme as something that will happen. Any resignalling on the Beverley to Bridlington or York to Scarborough lines will need to make passive provision for future junctions, and we will closely monitor any developments on these lines.

The line will have to be built with a mixture of public and private money. The  Campaign will be investigating this further throughout 2014/15.  

How many people will use the line? 

The 2005 Carl Bro report prepared for the campaign noted "The estimated annual 2004 passenger figures are a total of 395,000 journeys per annum for one train per hour, 584,000 journeys per annum for two trains per hour and 622,000 journeys per annum for two trains per hour, with one extended to/from Leeds. A sensitivity analysis suggests that these figures may vary by up to 30%." Since then, a Northern Rail spokesman has suggested these figures were probably on the low side, given the recent increases in national rail travel.

What about Haxby station?

The people of Haxby, Wiggington and Strensall have indicated that a station, or stations, serving these villages would be popular, and a study has been carried out, showing this to be feasible, when served by trains to and from Scarborough. We believe that if a new station was built to serve both the Minsters Line and Scarborough lines, this would be of great benefit to those communities. We organised a public meeeting in Haxby in February 2013 but unfortunately there has been little progress since.  

 HORIZONTAL ROUTE

 

 

 

 

 

LATEST NEWS

LETTER IN RAIL MAGAZINE

Minsters Rail Campaign secretary David Pennie has had a letter published in Rail magazine re-inforcing the argument that the Minsters line would act as a second route into Hull should the Humber shoreline route not be available due to flooding.

MINSTERS RAIL CAMPAIGN ON TV

We are hoping to feature on BBC television on the programme "Inside Out" when MRC member James Wilson will commute into York showing the difficulties he faces.

MEMBERSHIP  FEE INCREASE

The cost of postage has meant that reuctanty the MRC has had to increase annual membership to £10. Life membership remains at £50.

Two year mebership is available for £17.50

yU can download a Membership Form here

PUBLIC MEETINGS

Once the election is over the MRC plan to hold public meetings at Beverley, Pocklington and Market Weighton to  rise our profile.

BAD NEWS

Development has started on the site of  our proposed Pocklington station. Short sighted and a step back for the campaign.